Workday hiring is usually urgent by the time it becomes a request. A go-live date (the day a new Workday setup goes into use) has moved. A key admin has resigned, year-end is close, or a second phase was approved with nobody to staff it.
In each case, the cost of a slow hire is not the recruiter's time. It is weeks of backlog, a delayed switch to the new system, or a payroll lead covering two roles until help arrives.
Speed is easy to promise and hard to trust, so this guide explains how it works. It covers which steps take time, when they happen, and which ones no vendor can remove for you. Figures on Turbin come from vetted consultants and from engagements run through Turbin so far.
Why does an agency hire take 3–6 weeks?
Because the work starts after you ask. Most staffing agencies get your request and only then start finding, screening and contracting someone. Each step is real work, done one after another, and your project waits through all of them.
Experienced Workday consultants rarely answer postings, so the recruiter searches listing sites and their own database. They reach out one message at a time. The good consultants reply slowly because they are busy on someone else's project.
Screening comes next. It is usually a phone call with a recruiter who does not do Workday work themselves. Recruiters often match on titles and keywords, like "Workday consultant", rather than the module and the work. A recruiter who has never set up the approval steps Workday runs for a hire or a pay change is deciding whether someone else can.
Reference and certification checks are the steps most often skipped in a rush. Done properly, references take days of back and forth. A certification check needs someone who knows what a current one looks like.
Then come the paperwork and the calendar. A new agency means a new contract or statement of work, setup as a new vendor, and your procurement team's review. That review alone can take a week.
Interviews get booked around the hiring manager rather than the consultant, and two rounds a week apart are common. None of this is slow for lack of effort. It adds up to 3–6 weeks because each step waits for the one before it.
The wait is not the only cost. Once the consultant starts, the agency's markup, typically 40–100% on top of the consultant's rate, applies to every hour they bill. The markup guide works out what that adds up to.
What a 48-hour hire actually looks like
A 48-hour hire is the same steps in a different order. The checks happened when the consultant joined the network. So after your request, what is left is a match, a yes from the consultant, an interview and an e-signature.
Consultants apply once to join, and about 9% are admitted. The review covers 3 verified references from recent projects and their Workday project history. Certifications are checked against the partner record where the consultant holds one. That review is the part an agency starts after you ask.
At hour zero, you describe the project in plain language. Include the module, the scope, hours a week, the start date, your time zone, and a rate ceiling if you have one. About two minutes later, the matching engine has ranked the whole network against that description. It returns a shortlist, usually three names. The match is on the module and the work you describe, not on a job title.
Consultants never apply to projects, so nobody is sorting a pile of applications. Nobody is waiting on replies to cold messages either.
Each matched consultant then approves or rejects the match. That is how they confirm they are free for your dates and hours. You interview the ones who approved, for fit and Workday depth.
References and project history were already checked, so the interview does not need to cover them again. The interview guide has module-specific questions for that call.
The paperwork is the last step and the shortest. A new client e-signs one master services agreement (MSA), the main contract with Turbin, plus a rate confirmation for the consultant. A returning client already signed the MSA, so only the rate confirmation is new.
Turbin hires and pays the consultant, so your accounts payable team has no new vendor to set up. There is no minimum engagement either, so nobody has to negotiate a term length before the start. Then the consultant starts. End to end, the median is 48 hours from request to a signed consultant.
What can still slow it down?
Mostly steps on your side. The 48-hour median runs from request to a signed consultant. Access to your Workday system (Workday calls it a tenant) comes after, and your IT team's queue decides how long it takes.
The consultant needs a login, the right security groups (the permission sets that control what a user can see and do), and often a VPN or single sign-on setup. Raise the request the day you sign, not the day they start. Decide in advance whether they work in a test copy of Workday (a sandbox), in your live system, or both.
A first-time procurement review is the other common delay. If your procurement team reviews every new vendor, the first engagement waits for that review. But it happens once: the MSA covers every consultant you hire after that.
A second interview round with a different person usually costs days, not hours. If two people need to agree on the hire, put them in the same call.
Requirements that narrow the field slow the match too. A rare mix of modules, a narrow time-zone window, or a rate ceiling well below the median rate for the module all do this. None of these is a reason to drop the requirement. State it in the request, so the shortlist reflects it from the start.
What you need ready to move that fast
A specific request is the one thing only you can supply. The matching engine ranks the network against what you write, so a vague description gets a vague shortlist at any speed. Five details make the difference.
- The module or modules, not a job title. For example, "Absence and Time Tracking, after go-live" instead of "Workday HR consultant".
- The shape of the work: a backlog of fixes, a second-phase project, building an integration, or a year-end.
- Hours a week and how long you expect it to last.
- The start date and the time zone your team meetings run in.
- A rate ceiling, if you have one.
An integration is a connection that sends data between Workday and another system. The shape of the work matters more than it looks, because matched consultants decide whether to approve the match based on it. Hours matter for the same reason.
Part-time is the normal shape of this work. Across engagements run through Turbin so far, the median is 15 hours a week for about 6 months. On the network, 72% of consultants take part-time work, so a part-time request does not slow anything down.
Time zone and rate work as filters. The network spans 19 countries, so say when your team meetings are and how much overlap you need. Rates are on each consultant's profile, so a ceiling removes consultants you would not hire before the interview, not after it.
If the work is a payroll year-end, the year-end guide covers when to book so the calendar does not hold you up.
Questions we get asked.
Yes, because the slow parts happened before you asked. Every consultant on Turbin passed the admission review when they joined: 3 verified references, Workday project history, and certifications checked where held. The matching engine ranks the network in about two minutes, and matched consultants confirm by approving the match. The MSA is signed once. The 48 hours save time on scheduling, not on checks.
Say so in the request. The network spans 19 countries, so the match can take your time zone into account. Tell us when your team meets and how many hours of overlap you need. A narrow window means a smaller shortlist, but an honest one.
If the first week's work is not good enough to bill, the consultant is replaced within 72 hours at no charge. The replacement comes through the same matching against the same project description. You are not starting a new search or rewriting the requirements. Tell Turbin what was missing. That sharpens the next match more than anything in the original description. Comparing a staffing agency? Ask it the same question before you sign. Does a poor first week mean a new search, and who pays for the lost time?